Earthwork Volume Calculation
Performs earthwork volume calculations.
Loosening Rate (L) = Loosened Soil Volume / Raw Soil Volume
; Compaction Rate
(C) = Compacted Soil Volume / Raw Soil Volume
Volume of undisturbed soil: The volume of soil in the undisturbed ground that has not been altered in any way
Volume of loosened soil: The volume of soil that has been excavated and loosened
Volume of compacted soil: The volume of soil that has been filled in or compacted within a hole
; Compaction Rate
(C) = Compacted Soil Volume / Raw Soil Volume
Volume of undisturbed soil: The volume of soil in the undisturbed ground that has not been altered in any way
Volume of loosened soil: The volume of soil that has been excavated and loosened
Volume of compacted soil: The volume of soil that has been filled in or compacted within a hole
No customer feedback for this calculation yet.